Supporting documents for consultation

Traffic Resolution TR63-23

This document describes in detail the proposed changes and controls to the streets.

TR63 23 Thorndon Connections Transitional Bike bus and pedestrian improvements FINAL 1 (4.6 MB)

The plans - General layout

These are drawings and plans of the area. The general layout show the proposed changes to road markings in the area.

Thorndon connections General Layout (19 MB)

The plans - signage layout

These are the drawings and plans for the area. The signage plan describes proposed changes to signage in the area.

Thorndon connections Signage Layout (22 MB)

The plans - full plot of the area

This plans shows proposed plans for the area on one page. 

Thorndon Connections General Layout FULL PLOT (20 MB)

Multi-criteria analysis (MCA)

This document describes the options we considered when developing the proposed changes for the Thorndon Connections area.

Transitional Cycleways Multi Criteria Analysis MM with appendix FInal 2022 12 14 (2.8 MB)

Road safety and accessibility audit

This is an independent review of the proposed plans

Thorndon connections 90% Road safety audit Final (1.6 MB)

Parking management plan

This parking management plan covers parking data and makes recommendations for the management of parking in the area.

Thorndon Connections Parking Management Plan (7 MB)

Consultation summary

This document summaries feedback received from the community about the project during the March 2023 consultation period. This report was presented to Council, along with all submissions in full when they were making the decision to proceed to installation.

ThorndonConnections ConsultationSummary 27April23 FINAL (5.7 MB)