Detailed design drawings

Berhampore to Newtown route

This is a full set of plans for the project following consultation. It details all the street changes, including markings and signs.

Berhampore to Newtown Detailed Plans Combined (24 MB)

Dover Street

This is a set of plans for the changes to install more car parking on Dover Street. It details all the street changes, including markings and signs.

Dover Street Detailed Plans (2.4 MB)

Bus, bike, and pedestrian improvements supporting documents - consultation 2023

The plans

This is a full set of plans for the project. It details all the street changes, including markings and signs.

Berhampore to Newtown Design 120923 (7.9 MB)

Traffic resolution TR 127-23

This document describes in detail all the changes to streets and paths for the Berhampore to Newtown bus, bike, and pedestrian improvements.

TR127 23 Berhampore to Newtown 2023 (12 MB)

The options considered - multi-criteria analysis (MCA)

You can read about the options that were considered and why we progressed one option into design.

Berhampore to Newtown Multi Criteria Analysis Final Report (4.6 MB)

Safety and accessibility audit

This is an independent safety and accessibility audit of the proposed changes.

Berhampore to Newtown 90 CASA (2.2 MB)

Wakefield Park parking management plan

This plan has parking data and recommendations for managing parking in the Wakefield Park area.

Berhampore to Newtown Wakefield PMP (2.6 MB)

Consultation summary report September 2023

This document provides a summary of community feedback collected during the consultation period (September 2023).

Berhampore to Newtown ConsultationSummaryFINAL (5 MB)

Discovery phase supporting docs

How things are currently working - survey analysis

This document summarises community feedback on how people experience the bike and bus route on Rintoul Street, Luxford Street and Adelaide Road and how they use on-street parking in the Berhampore and Newtown area.

This information will be used by our project teams as they develop proposed changes for the area.

B2N BaselineSurvey Report 22Dec22 FINAL (5.6 MB)

Berhampore village background documents

Community workshops 2022

In November 2022, to restart the conversation and gather more up-to-date feedback from the community, we held two workshops to help come up with draft designs that fit with the objectives from earlier workshops held in 2019.

Read the summary of workshop 1

Read the summary of workshop 2

All drop-in sessions March-May 2019 - summary of feedback

This document summarises the feedback we heard about through Berhampore Village upgrade through March-May 2019.

Read the feedback

Drop-in session May 2019 - community feedback

This document summarises the feedback we heard about the Berhampore Village upgrade at the 18 May 2019 drop-in session.

Read the feedback

Drop-in session March 2019 - community feedback

This document summarises the feedback we heard about the Berhampore Village upgrade at the 23 March 2019 drop-in session.

Read the feedback