Council papers and documents

Karori Connections walk bike and bus improvements

Final proposal with amendments

Karori Connections walk bike and bus improvements traffic resolutions approval 13 Dec 2023 (258 KB)

Consultation summary 2023

A summary of submissions

KaroriConnections ConsultationSummary 2023 (4.2 MB)

2023 consultation supporting documents

Street layout plans

This shows the plans for how the street layout would be changed.

KARORI TR DESIGN GENERAL LAYOUT PRIMARY ROUTE 110923 (15 MB)

Safety and accessibility audit

This is an independent safety and accessibility audit of the proposed changes.

BG Karori 90 CASA vfinal (2.9 MB)

Signage plans

This is a full set of plans for the project. It details all the changes to signage.

KARORI TR DESIGN SIGNAGE PRIMARY ROUTE 110923 (21 MB)

The options considered - Multi-criteria analysis (MCA)

You can read about the options that were considered and why we progressed one option into design.

Karori connections Multi Criteria Analysis Final Report (2.4 MB)

Parking management plan

This parking management plan covers parking data and makes recommendations for the management of parking in the area.

Karori connections Parking Management Plan BG2K Final 280823 (6.5 MB)

Traffic resolution TR147-23

This document describes in detail the proposed changes to the streets and paths in the Karori connections project. 

TR147 23 Karori Connections (7.5 MB)

2023 Complementary Routes Installation Designs

South Karori Road designs

Installation designs for South Karori Road

SOUTH KARORI ROAD CONSTRUCTION DRAWINGS (5.5 MB)

Birdwood, Braithwaite, Lancaster designs

Installation designs for Birdwood, Braithwaite, and Lancaster Streets

BIRDWOOD STREET CONSTRUCTION DRAWINGS (3.9 MB)

Friend Street designs

Installation designs for Friend Street

FRIEND STREET CONSTRUCTION DRAWINGS 23 August 2023 (14 MB)

Discovery phase supporting documents

How things are currently working survey summary

This report summarises feedback from the community about how the current routes and bus stops are working in the Karori connections project area. This information is collected before any street changes are made to help create better designs and so we can see the impact any potiential changes once installed.

KaroriConnections BaselineSurvey Report 17July23 (3.8 MB)